Drilling & Injection Services at Manufacturing Facility

Drilling and Injection Services at Manufacturing Facility
A remedial investigation of this former manufacturing facility identified groundwater contamination of volatile organic compounds (VOCs) in the overburden aquifer. The plume was approximately 1,000 by 400 feet. A-Zone performed a client managed remedial approach installing injection points using a Geoprobe® direct push drill rig. A-Zone provided the equipment, labor and expertise to apply an in situ treatment of SRS® -Zν using at various injection points using a mobile injection pump system to achieve even distribution. Other activities included groundwater monitoring installations, spill response, and constructing diversions and storm water inlet protections to ensure containment of in-situ treatment.